CONSTRUCTION SAFETY AUDIT CHECKLIST Conditions to Check 1. Housekeeping and Sanitation: * General condition of work areas * Adequate trash removal * Floor openings covered or guarded * Stairs and walkways cleared of debris and materials * Note any slip, trip, or fall hazards; guardrails erected on stairways, wall openings, etc. * Adequate lighting * Adequate ventilation * Toilet facilities adequate * Drinking water and cups provided 2. Personal Protective Equipment Issued and Used as Instructed: * Hard hats * Protective glasses and goggles * Gloves * Respirators 3. Ladders and Scaffolding: * In good, serviceable condition * Properly positioned and secured at the top * Extend 36" above roof or platform, if used for access * Doors blocked open, locked, or guarded off if in front of ladder * Stepladders fully open when used * Metal ladders not used for work in electrical areas * Sound, rigid footing for all scaffolds * Safe access to all working levels * Equipped with standard guardrails, midrails, and toeboards * Protection provided where persons are required to work or pass under scaffolding in use * No accumulation of tools or material on platforms * Outriggers installed, if required * Self-propelled (motorized) types of scaffolds require special maintenance and inspection 4. Portable Power and Hand Tools: * General condition of tools * Proper tool being used for job being performed * Guards and safety devices are operable and in place * Electrical tools inspected and marked according to the Assured Equipment Grounding Program * Tool retainers used on pneumatic tools; air pressure properly regulated * Check for pinch and shear points 5. Powder-Actuated Tools: * All operators trained and certified * Tools and charges protected from unauthorized use * Loaded tools are not left unattended * All tools inspected and tested daily before use * Tools and charges matched to recommended materials only * Safety goggles or face shields used by operators * Local regulations complied with 6. Welding and Cutting: * Operators trained and qualified * Personal protective equipment * Fire extinguishers provided Continued * Flammable materials protected * Gas cylinders secured * All fittings free of oil and grease * Flashback protection used * Proper gauge settings * All hoses, cords, and other equipment in good condition 7. All Material Storage and Handling: * Materials properly stacked and on firm footings; properly blocked and secured * Fire protection adequate * All rigging and lifting equipment properly maintained and inspected periodically * Employees picking up and handling loads properly * Flammable liquids stored only in approved containers * Flammable gases properly stored * Adequate security measures 8. Fall Protection: * Guardrails provided where necessary * Personal Fall Arrest Systems (PFAS) provided where necessary * Fall protection plan implemented where PFAS not used 9. Excavation and Trenching: * All excavations or trenches properly shored * All excavations have proper means of entry and exit * Excavations or trenches inspected by competent person 10. First Aid Kits: * Kits provided * Kits inspected and replenished where necessary Project Name: __________________________ Project Number: _____________________ Superintendent: _________________________ Date: ______________________________ Created from Exhibit 6-3 of the Model Safety and Health Program for the Building Industry, 2d ed. (NAHB Labor, Safety, and Health Services Department, 1995), 24-25.